‹

›

G80 Master Link Assembly

Product Parameters

Cheap master links are cast with internal voids, easy to break under heavy load. Poor heat treatment leads to permanent stretching. Thin coating peels off and rusts quickly. Vague marking fails safety inspection. Rough inner corners cut chains. Poor tolerance causes jamming and uneven load.

✅ Grade 80 drop-forged alloy steel, quenched & tempered, high impact resistance

✅ Parent-child structure for 2-leg slings, balance load and prevent chain twisting

✅ Red powder coating, impact resistant and anti-rust

✅ Clear G80 & WLL marking on ring body for EU EHS audit

✅ Smooth inner radius to reduce chain wear

✅ Precise dimension, flexible connection without jamming

Safety Warning

✅ Pre-use inspection: check master link and sub links for cracks, dents and deformation, confirm marking readable.

✅ Never overload. All rigging parts (chain, hook, master link) must have the same WLL.

✅ Axial loading only. Side pull, squeezing and offset load are forbidden.

✅ Do not weld, grind or heat the link, high temperature will reduce strength.

✅ Keep a reasonable sling angle. Larger angle will greatly increase actual load.

✅ No personnel under suspended load. Shock loading is prohibited.

✅ Keep away from welding spatter, high temperature and corrosive chemicals.


628bc5d4a71509ddb1f3ca33b913512b

d3c1144320bfb31bb3150dbe25a83299

详情1

详情2

详情3

详情4

详情5

详情6

详情7

详情8


Customer Feedback

  • 保证货期
  • 卸扣好评
  • 确认尺寸
  • 1电动地牛处理售后
  • 2电动地牛处理售后
  • 3电动地牛处理售后
  • 4电动地牛处理售后
  • 钢丝绳锰钢链条好评
  • 手动地牛好评
  • 评价
  • 手动地牛好评
  • 聊天记录
  • 沟通4
  • 好评图1
  • 好评图2

Frequently Asked Questions

01 Factory & Company Verification

1. Can you provide recent photos and videos of your facility and production lines?

Yes. We can send you the latest photos and videos of our workshop, production lines, warehouse and QC area within 24 hours once you request. No need to wait until order confirmation.

 

2. Would you be willing to conduct a live video factory tour before an order is placed?

Yes, we are happy to arrange live video factory inspection for you. We support WhatsApp / WeChat. Available time: Monday to Saturday, 08:30–17:30 (GMT+8). We can show any production line you want to check.

02 Products & Specifications

1. What is your MOQ?

MOQ is 1 piece / 1 set for all standard products.

Pallet trucks, slings, chain assemblies, wire rope slings and rigging hardware all accept trial orders of 1 unit. The quotation rule is the same for small trial orders and bulk orders.

03 Quotation & Order

1. What information do you need to give me an exact quotation?

Please send us product name / model, specifications (WLL, lifting height, sling length), quantity, customization requirements, and destination port or address. We will send a formal quotation within 24 hours.

 

2. What are your price terms and payment terms?

We support EXW, FOB Tianjin / Qingdao, CIF, DDP as you require.

Payment: 30% T/T deposit, 70% balance before shipment. For sample orders, Alibaba Trade Assurance, PayPal and Western Union are also acceptable.

 

3. How long is your lead time?

Stock items: 3–7 working days.

Standard production orders: 15–25 working days.

Customized orders: 25–35 working days after deposit received and drawing confirmation.

04 Quality, Packing & Delivery

1. Where do you ship from and how do you handle freight?

We mainly ship from Tianjin Port, and also use Qingdao Port. Sea freight for bulk orders, air freight or express delivery for samples. Send us your destination port, we will quote goods price plus estimated freight together.

 

2. What warranty and after-sales support do you provide?

We offer 12 months warranty against manufacturing and material defects.

Spare parts such as wheels, hydraulic pumps, seals, hooks and links can be supplied at cost price. Our technical team replies within 24 hours and provides video & photo guidance for troubleshooting.

 

3. How are the goods packed?

Pallet trucks: carton with foam protection, plywood case optional for LCL or full container.

Slings and rigging hardware: individual poly bag + export carton + pallet, sea-worthy packing with shipping marks and WLL labels.

 

4. How do you control quality before shipment?

We perform incoming material inspection, in-process welding & assembly inspection, 100% proof-load testing for slings and rigging. Pre-shipment inspection will be done, and we send inspection photos and test records to you for confirmation before loading.

G80 Master Link Assembly

Excellent

评分

589  reviews on

Request a Quote

Interested in this product? Share your specifications, quantity, and delivery destination so we can prepare a quotation for your needs.

CUSTOMER VISITS

Building Trust, Face to Face

Factory visits and face-to-face discussions help us understand your requirements, share product details, and explore opportunities to work together.